Every ArborHaus build follows the same consultation-led path. The variables are your site, your brief, and your budget. The constant is our approach: high-performance building principles, considered design, and transparency from the start.

Step by step

THE FULL WORKFLOW.

Each step has a defined deliverable, a defined participant, and a defined budget impact.

See the timeline
  1. Discovery Consultation

    30 minutes with a consultant. We learn the site, the brief, and the budget envelope. No commitment.

  2. Configuration Session

    Live walkthrough of the six configurable parameters: form, footprint, storey, cladding, glazing, internal lining.

  3. Technical Specification

    Drawing set, structural notes, price breakdown, energy modelling, and 18-week timeline — delivered as a single PDF.

  4. Signed Engagement

    10% deposit. Engineering opens within two weeks. The CNC panel file enters production six weeks after sign-off.

  5. Site Erection

    Four working days for the structural shell. A further three weeks to lock-up. Practical completion at week 18.

ArborHaus workshop and CLT panels
Wodonga workshop — every panel CNC-milled to ±2 mm tolerance

Book a Session

THIRTY MINUTES. EVERYTHING.

Architectural configuration in a single session. Leave with a complete technical specification, transparent pricing, and a clear timeline.