Skip to:

Australian Cross-Laminated Timber · High Performance Homes

ARBORHAUS

We build high-performance homes that are thermally efficient, architecturally precise, and designed around a smarter construction process. Where it suits the project, we use CLT for its speed, precision and structural performance.

Sit down with us for 30 minutes and leave with a clear understanding of your home, specification, and next steps.

LIVE STRUCTURAL DATA

980

kg CO₂ sequestered / m² CLT

4

CLT Archetypes

30

Minutes to configure

from 30

weeks build program*

High Performance

Design & Build

The Process

HOW IT WORKS.

No guesswork. No surprises. ArborHaus consultation model means you arrive knowing the constraints and leave knowing the outcome.

See all steps
  1. Book a Session

    A 30-minute guided consultation. In-person or video. Your consultant brings the complete design system.

  2. Configure Together

    Step through four architectural parameters. Every selection is structurally resolved. Nothing arbitrary.

  3. Receive Your Spec

    A complete technical specification sheet generated in real-time. Price, timeline, and floor plan. Transparent.

  4. Sign and Begin

    A 10% deposit locks your configuration. Pre-construction process commences within two weeks.

CLT — Cross-Laminated Timber

The Catalogue

FOUR FORMS.

Each design is a resolved CLT structural system. Not concept — construction-ready.

View all

1 Storey storey · The Gable

The Gable

Why CLT

STRUCTURE THAT BREATHES.

Cross-Laminated Timber is not a trend. It is an engineering solution that outperforms concrete and steel on thermal performance, build speed, structural integrity, and carbon footprint.

  • 5×

    Lighter than concrete

    CLT panels achieve the same structural rating at a fraction of the weight. Enables faster, cheaper foundations.

  • 980kg

    CO₂ sequestered / m²

    Every cubic metre of CLT locks in approximately 980kg of CO₂. Your home is a carbon sink.

  • ±2mm

    Panel precision

    CNC-milled to ±2mm tolerance. Every connection is pre-engineered before a single panel arrives on site.

  • 16+

    Faster structure

    A structurally complete CLT shell can be erected in days. Traditional masonry takes weeks.

Book a Session

THIRTY MINUTES. EVERYTHING.

Our consultant-led quoting session is not a sales call. It is an architectural configuration session. You will leave with a complete technical specification, a transparent price, and a clear timeline.

  • 0130-min guided session
  • 02Live price configuration
  • 03Technical spec sheet
  • 04Digital design folder